Rail.Yaar Rail.Yaar

MGR Chennai Central to Lokmanya Tilak Terminus Trains

Direct train timetable, running schedule, and 60-day ARP ticket booking opening dates from MAS to LTT.

Quick Date:
POPULAR STATIONS
Direct Trains Found
1 Trains
Fastest
23h 15m
Direct Rail Distance
1280.7 km
Selected Date
2026-10-03
Showing 1 direct train(s) for 2026-10-03
22160 Superfast Express

Mumbai CSMT SF Express

MTWTFSS
Departure
13:15
MAS • MGR Chennai Central
23h 15m
27 halts • 1280.7 km
Arrival
12:30 +1D
CSMT • Mumbai CSMT
Runs on selected journey date (2026-10-03).
60-Day ARP Booking Opens:
2026-08-04 at 08:00 AM IST Window Open
Tatkal AC: 2026-10-02 at 10:00 AM IST • Tatkal Non-AC: 2026-10-02 at 11:00 AM IST

Frequently Asked Questions (FAQ)

What is the fastest train running from MGR Chennai Central (MAS) to Lokmanya Tilak Terminus (LTT)?

The fastest train on this corridor is highlighted in the summary card above. You can also sort the train list by 'Fastest Journey' to see options with the shortest travel duration.

When does IRCTC ticket booking open for MAS to LTT trains?

General 60-day Advance Reservation Period (ARP) booking opens 60 calendar days before the train's originating station departure date at 08:00 AM IST. Each train card shows the exact opening date.

What are the Tatkal booking timings for trains between MAS and LTT?

Tatkal ticket booking opens 1 day prior to origin departure: AC classes open at 10:00 AM IST, and Non-AC classes (Sleeper) open at 11:00 AM IST.